In partnership with the Renewable Energy Business Incubator, Norges Vel, FK and HPS, Chapter Ten Ltd installed a 32kWe biomass generation plant on the 28th May, 2014. Electricity generated is being used to power the office building, part of it is used for powering grain processing equipment i.e. the grain dryer and cleaner. They are also in the process of acquiring milling equipment at their farm, so the gasifier will also be used to supply power to this equipment. The gasifier is currently reducing their reliance on a diesel generator which hasn’t been cost effective.